Hurtig samling af Klepper AE II

Hurtig samling af Klepper AE II

Decide who is team member A and B. Person A is responsible for the long bag with keelboards, gunwales, etc. Person B is responsible for the hull bag and ribs.
The duties below determine who should be A and who B. For example, whoever is handiest with the several steps of rudder assembly should be B.
Place identifying red tape on all front pieces, blue or green on rear pieces. Here goes:


  • A empties longbag, B the hull and rib bags.

  • A sorts long pieces into front and rear piles. B sets out ribs in sequence alongside and lays out skin.
  • A assembles front half of frame, B rear half. Both insert their halves into the skin.
  • Together they join frame halves and puffin long stringers.
  • A puts in Rib #3 and grabs coaming, B ribs #4 and 5.

  • A puts in masthead end of coaming.
  • Both connect snaplocks of ribs and tuck in black edge piping into coaming grove.
  • Whoever gets to rear first puts in the boomerang piece.
  • Each puts in respective seat and seat back. Each inflates pre-agreed upon port or starboard air sponson, 2/3rds full.
  • A inserts foot pedal assembly. B places on rudder yoke, pins and cables,
  • A attaches front of tuck under spray deck, B the rear. Each tucks under one side. A and B then finish inflating sponsons.

Af jens den 05 februar, 2003 11:32




Post en kommentar